PR inside: Fulcrum Metals PLC Announces Interim Results for the six months to ...
(PR-inside.com) Unaudited interim results for the six months to 30 June 2026
BROMSGROVE, UK / ACCESS Newswire / September 28, 2026 / Fulcrum Metals Plc ("Fulcrum" or the "Company" or the "Group")(AIM:FMET)(OTCQB:FULMF), a company pioneering the use of innovative cyanide-free technologies developed by Extrakt Process Solutions to recover precious and critical metals from mine waste and to support potential site regeneration, announces interim results for the six months to 30 June 2026.
Operational and Strategic Highlights
Transitioned from technical validation and strategic positioning into execution, with Teck-Hughes Phase 3 testing achieving 78% gold recovery alongside strong recoveries of other precious, base and critical metals ..
https://reports.pr-inside.com/fulcrum-m ... 227950.htm
Copyright PR-Inside.com 2026
